In this installation guide, we will demonstrate how to fit EPDM at the perimeter walls and internal corner details. This is important detailing carried out after main field sheet application and ensures a neat finish and watertight seal at traditionally vulnerable installation points on the flat roof.
Buy all the products you need securely online with fast UK delivery at PermaRoof Store. Give the team a call if you need any further help with your order or installation. |
Step 1
Once the main field sheet is adhered, the perimeter walls can be dealt with. With the membrane 150mm away from the perimeter wall, apply bonding adhesive to both the back of the membrane and also the area it is to be mated with.
Note: When applying the bonding adhesive (now dark green in colour), all areas have to be cleaned and dry. The adhesive can be applied with either a small 4” roller or similar size paintbrush.
Care needs to be taken when using bonding adhesive. Spillages can swell the membrane, so it is worth keeping the adhesive and rollers away from the roof membrane. An offcut of EPDM is ideal as a base for the adhesive container.
Step 2
Apply an even coat of adhesive to all surfaces to be mated.
Step 3
Once the adhesive is tacky, offer up the membrane by rolling it into the angle change and then up the upstand wall. This method prevents any tenting of the membrane at the angle change.
Step 4
When one wall is completed, repeat the procedure to the adjoining wall. An excess of material will collect in the corner, which needs to be tidied up and secured. This excess is commonly known as the “pig’s ear”. The pig’s ear can be attached to either wall, whichever is convenient. It is necessary to fold the pig’s ear out of the way.
Step 5
Apply bonding adhesive inside the flap, wait until tacky, then mate it together.
Step 6
Apply QuickPrime Plus primer to the back of the flap as shown. The flap will then adhere onto the upstand and complete the finished detail.
The following procedure will explain how the internal corner is formed on top of a parapet wall.
Step 1
When one wall is successfully adhered, the adjoining wall can be dealt with. Mark a crayon line at the top of the wall and cut the membrane to the corner.
Step 2
The pig’s ear can now be formed.
Step 3
All excess membrane is removed.
Step 4
And then the membrane can be securely adhered.
Step 5
A Quickseam Corner Flashing patch is the finishing detail for this corner, and this is applied with QuickPrime Plus.
A note about finishing and flashing
When flashing up a wall, there are various options for termination. Lead flashing is a common finish as well as metal wall trim.
If attaching metal wall trim into a wall chase, use PermaRoof Bond and Seal to waterproof the top edge of this trim, and mechanically fix the trim to the perimeter wall with tech fixings.